HOA Built a $9M Data Center Behind My Ranch — Then Crossed My Land

HOA Built a $9M Data Center Behind My Ranch — Then Crossed My Land

Chapter 4

Theme:
Font Size:
24px

I took the pickup west along the two-track road my father used to call the long way around. Fresh dust hung above the fence despite the morning humidity. When I crested the last rise, I saw a construction site spreading across the neighboring property like a second town. Bulldozers were cutting a broad rectangle into the soil, dump trucks were moving in and out, and a row of excavated trenches ran toward a steel-framed structure that had not been there the week before.

There were concrete forms, stacked conduit, portable offices, and white hard hats moving between machines. A large sign stood beside the site entrance, far enough from my property that I could read it without leaving the ranch. NORTHRIDGE REGIONAL DIGITAL INFRASTRUCTURE CENTER, it announced, followed by logos for a development partnership, an electrical contractor, and a firm I did not recognize. Below the logos was a number for project inquiries and a slogan about bringing tomorrow's connectivity to the county.

I parked beside the fence and dialed the number. A receptionist answered in a cheerful voice that sounded as though she had been instructed to make everybody feel included. She told me the facility would house regional computing and communications equipment and that its investment budget was approximately nine million dollars. When I asked whether the project involved my land, she said it was entirely on the adjacent development parcel and that there should be no impact on neighboring owners.

I looked at a series of painted stakes extending toward my fence. Beyond them, somebody had tied orange survey ribbon to a post on my side. The receptionist could not explain those markers, and eventually she suggested I contact the Northridge Estates Homeowners Association. I asked why an association that did not include my ranch would have anything to say about the construction route. She said she could not discuss that and ended the call with an apology that sounded rehearsed.

The letter was in my mailbox when I returned to the house. It was printed on thick paper bearing the Northridge logo and signed by Margaret Collins, president. Most of it celebrated economic opportunity, increased infrastructure capacity, and the value of modern services for hundreds of households. The phrase that mattered appeared near the bottom, where it said the planned high-voltage connection would utilize a utility corridor adjacent to the Mercer property.

I read adjacent twice. The word seemed chosen by somebody who knew that across would start a different conversation. There was a map attached, but the line showing the electrical route was pale and partly hidden behind the printed legend. I held it under the kitchen light and saw that the proposed route did not merely run near the western boundary. It entered my land, crossed a pasture, followed an old service trail, and came out near the highway more than a quarter mile away.

News in the same category

HOA Built a $9M Data Center Behind My Ranch — Then Crossed My Land

46 Part