HOA Cut My Power Pole—Then 180 Homes Went Dark Before Dinner.

Chapter 5

Theme:
Font Size:
24px

There was one more thing, and it is the thing that makes the ending what it is. Over the years, the utility had rebuilt and upgraded that extension twice. When they went from an older configuration to the current one, they consolidated equipment, and the pole at my eastern line became a switching and tap point for the feeder that serves all three phases of Silver Pines.

Not a spur, not a lateral to a barn, a structure with a set of primary conductors, a bank of transformers for my service, and above all of it, the run that turns east and feeds every house behind that tree line. If you drew the electrical map of Silver Pines, that pole was the throat.

I knew that because it had been my job to know things like that for nineteen years. And because I had personally stood in a bucket at the top of it in 2009 changing out an insulator in a sleet storm. So the morning after my third fence conversation with Vanessa, I called Grant Ellison.

Grant is an operations supervisor at the utility. Fifty-two. Flat voice. The kind of man who says four words where other people use forty. We worked together for six years and I trust him because I have watched him tell a vice president no.

I told him what was happening, gave him the pole number off the tag and asked him to look at his system. He was quiet for maybe forty seconds while he typed. Then he said, “There is no work order for Silver Pines.” I asked, “Is there a relocation request open? Anything pending? Anything in engineering review?”

Nothing. No request, no estimate, no design. Nobody has contacted us about that structure in eighteen months. And the last contact was a vegetation crew. That was the first moment I felt real cold in my stomach. And I want to be clear about why.

Up to that point, I had assumed the worst case was a fight. Letters, maybe a survey, maybe a lawyer, maybe a year of unpleasantness at the mailbox. What Grant just told me meant something different. It meant that whatever Vanessa had told her contractor, she had not gotten it from the utility.

It meant that if a crew showed up and put a saw to that pole, there would be no de-energization, no switching order, no crew standing by, no isolation of the circuit, and no notification to a single one of those one hundred eighty houses. I told Grant the association had crews scheduled for the following day.

He said he would send somebody out to look and he would flag it internally, but he also said the thing that made the timing so ugly. He said his inspector was on a substation job forty minutes north and the earliest he could get eyes on it was two days out. Two days out was going to be too late and both of us knew it.

News in the same category

HOA Cut My Power Pole—Then 180 Homes Went Dark Before Dinner.

14 Part